DACI Utilities Engineering Consultancy supported the Battery Energy Storage System through a detailed earthing design package covering the BESS site, the 400kV compound and harmonic filter interfaces. The project required coordinated design across high-voltage plant, battery infrastructure, civil constraints and above-ground connections.

Transmission-level interfaces, late-stage coordination actions and dense earthing requirements across adjacent high-voltage and BESS compounds.
DACI iterated the earthing package to support safe construction and operational reliability across the BESS, 400kV compound and harmonic filter plant.


A coordinated earthing showcase that demonstrates DACI capability on transmission-connected storage schemes, with clear treatment of BESS, 400kV compound and harmonic filter interfaces.
The scheme supports the transition toward a more flexible, low-carbon power system by providing large-scale battery storage connected to the transmission network. The earthing package reinforces DACI's capability in technically demanding, interface-heavy EHV infrastructure.


The scheme demonstrates DACI's ability to deliver detailed earthing design for a complex BESS site with a 400kV compound and harmonic filter. The project combines design control, constructability awareness and iterative stakeholder coordination.

DACI Utilities Engineering Consultancy delivered a comprehensive earthing assessment and design package to support a major SSEN network reinforcement programme involving an upgraded transformer and new Gas Insulated Switchgear.

DACI delivered a coordinated technical package that helped de-risk the connection, operation and safety case for a large PV solar farm development.