DACI Utilities Engineering Consultancy played a leading role in the delivery of the Iron Acton Battery Energy Storage System (BESS), a 120MW grid-scale development designed to support network stability and enable the integration of renewable energy at transmission level.
Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.

Design development for a high-power EV charging infrastructure scheme at Booths Keswick.

Design development for a high-capacity EV bus depot charging scheme at Merton Bus Garage, London.

Design of a capacity-constrained EV charging scheme where the proposed charging infrastructure required significantly more power than the available network capacity.

Design coordination for a microgrid site that initially came in as a HV metered scheme.

DACI played a pivotal role in supporting Kirby's in the early stages of The Windyhill substation which is currently in the process of being retrofitted to a 275kV Substation.

The OEM RMS and EMT models provided to the customer for plant-level model development exhibited significant performance and stability issues.
Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.