DACI provided multidisciplinary design for the 120 MW Iron Acton battery energy storage system, including its 132 kV National Grid connection, and developed a non-standard bonding solution that avoided a full cable replacement.
Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.
.png)
Design coordination for a microgrid site that initially came in as a HV metered scheme.
.png)
DACI played a pivotal role in supporting Kirby's in the early stages of The Windyhill substation which is currently in the process of being retrofitted to a 275kV Substation.

The OEM RMS and EMT models provided to the customer for plant-level model development exhibited significant performance and stability issues.

The Minety BESS project comprises two phases: Phase 1, an existing 99.8 MW installation, and Phase 2, a proposed 49.9 MW extension connecting to the 132 kV network.
.png)
One of the Medium Voltage (MV) skids had a different DC/AC configuration, introducing additional modelling complexity that had to be accurately represented and consistently captured across all studies.
.png)
DACI Utilities Engineering Consultancy delivered a comprehensive earthing assessment and design package to support a major SSEN network reinforcement programme involving an upgraded transformer and new Gas Insulated Switchgear.
Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.