DACI Utilities Engineering Consultancy played a leading role in the delivery of the Iron Acton Battery Energy Storage System (BESS), a 120MW grid-scale development designed to support network stability and enable the integration of renewable energy at transmission level.
Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.

The Minety BESS project comprises two phases: Phase 1, an existing 99.8 MW installation, and Phase 2, a proposed 49.9 MW extension connecting to the 132 kV network.

One of the Medium Voltage (MV) skids had a different DC/AC configuration, introducing additional modelling complexity that had to be accurately represented and consistently captured across all studies.

DACI Utilities Engineering Consultancy delivered a comprehensive earthing assessment and design package to support a major SSEN network reinforcement programme involving an upgraded transformer and new Gas Insulated Switchgear.

DACI delivered a coordinated technical package that helped de-risk the connection, operation and safety case for a large PV solar farm development.

DACI Utilities Engineering Consultancy supported the Battery Energy Storage System through a detailed earthing design package covering the BESS site, the 400kV compound and harmonic filter interfaces.

DACI Utilities Engineering Consultancy played a leading role in the delivery of the Iron Acton Battery Energy Storage System (BESS), a 120MW grid-scale development designed to support network stability and enable the integration of renewable energy at transmission level.
Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.