
DACI Utilities Engineering Consultancy played a leading role in the delivery of the Iron Acton Battery Energy Storage System (BESS), a 120MW grid-scale development designed to support network stability and enable the integration of renewable energy at transmission level.
Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.

DACI Utilities Engineering Consultancy was appointed to Devilla Wood (EHV-0170), a 500 MW / ~1 GWh grid-scale Battery Energy Storage System connecting to SP Transmission (SPEN) at 275 kV.

DACI Utilities Engineering Consultancy delivered the civil and structural design for the substation serving a solar farm at West House Farm, near Trimdon, County Durham.

DACI Utilities Engineering Consultancy was appointed to undertake the civil design associated with a 50MW Battery Energy Storage System at Sundon, off Water End Lane, Luton.

DACI Utilities Engineering Consultancy delivered the civil and structural design for the 132 kV substation serving a combined solar and battery storage development at Long Pasture, near Darlington, County Durham.
Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.
