.png)
DACI provided multidisciplinary design for the 120 MW Iron Acton battery energy storage system, including its 132 kV National Grid connection, and developed a non-standard bonding solution that avoided a full cable replacement.
Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.
.png)
DACI Utilities Engineering Consultancy delivered the civil and structural design for the 132 kV substation serving a combined solar and battery storage development at Long Pasture, near Darlington, County Durham.
Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.
