Iron Acton Battery Energy Storage System (BESS)

DACI Utilities Engineering Consultancy played a leading role in the delivery of the Iron Acton Battery Energy Storage System (BESS), a 120MW grid-scale development designed to support network stability and enable the integration of renewable energy at transmission level.

Read Full Case Study

Explore More Engineering Projects

Browse our portfolio of successful developments across residential, commercial, healthcare, education, and infrastructure sectors.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
EV Charging Infrastructure

EV Charging Infrastructure Enabled Through Non-Standard Elevated Substation Design and Flood Resilience

Design development for a high-power EV charging infrastructure scheme at Booths Keswick.

Read Case Study
HV
EV Charging Infrastructure

Delivering High-Capacity EV Bus Depot Charging Through Phased Infrastructure Coordination

Design development for a high-capacity EV bus depot charging scheme at Merton Bus Garage, London.

Read Case Study
HV
EV Charging Infrastructure

Sustainable EV Infrastructure Through Renewable Energy and Storage

Design of a capacity-constrained EV charging scheme where the proposed charging infrastructure required significantly more power than the available network capacity.

Read Case Study
HV
Microgrid & Distribution

Microgrid Coordination and Unit Substation Optimisation

Design coordination for a microgrid site that initially came in as a HV metered scheme.

Read Case Study
HV
Substation & Transmission

Windyhill Case Study

DACI played a pivotal role in supporting Kirby's in the early stages of The Windyhill substation which is currently in the process of being retrofitted to a 275kV Substation.

Read Case Study
EHV
Battery Energy Storage

Drum Farm – 49.9MW BESS

The OEM RMS and EMT models provided to the customer for plant-level model development exhibited significant performance and stability issues.

Read Case Study
PSS

Let's Build Something Together

Successful engineering begins with a structured approach designed to reduce uncertainty, improve collaboration, and support confident decision-making from day one.

Start Your Project
Five people posing at a green and white booth with 'Designing the Path Forward' and company info panels behind.