DACI was appointed at an early design stage to review and develop the electrical design for Phase 1 of a 48-dwelling residential scheme. Following receipt of the Distribution Network Operator (DNO) Point of Connection (POC) offer, the client required a detailed technical assessment and compliant design submission to ensure the proposed connection was suitable for the development.
.png)
DACI formally challenged the LV POC with the DNO, providing technical justification and requesting a High Voltage (HV) POC to ensure compliance and resilience.
At the same time, we reviewed the wider development proposals and considered the future 280-dwelling Phase 2. We assessed whether extending the HV network to a strategically positioned substation could potentially serve both phases, creating a more cost-effective long-term solution.

.png)
.png)
Early engagement enabled DACI to challenge the initial DNO proposal and secure a robust, deliverable solution before the development progressed.
.png)
Design coordination for a microgrid site that initially came in as a HV metered scheme.
.png)
Design development for a high-power EV charging infrastructure scheme at Booths Keswick.

Design development for a high-capacity EV bus depot charging scheme at Merton Bus Garage, London.
Let's Collaborate deliver resilient, future ready solutions.