The client appointed DACI to undertake an Existing Asset Utility Assessment at the proposed Ashmead Lane redevelopment site to identify any underground or overhead utility infrastructure. The assessment helped identify statutory utility constraints early, informing feasibility, programme, design development, and cost planning.

Hand holding a leaf sustainability icon
Service
Existing Asset Utility Assessment
Electricity transmission tower icon
Development
Proposed Redevelopment – Three Industrial Units
Industrial factory icon
Location
Ashmead Lane

Engineering Challenges

The site contained several high-risk utility assets, including: Medium Pressure (MP) gas main crossing the site

01

11kV High Voltage Cable

An existing 11kV HV cable located adjacent to the site boundary.
02

Live Low Voltage Connection

An existing LV connection requiring confirmation of disconnection or diversion.
03

Telecommunications Infrastructure

Existing telecommunications apparatus conflicting with the proposed site layout.
04

Protected Exolum Pipeline

The Exolum Pipeline System, subject to a 6-metre statutory easement.

DACI Solution

Our Approach

DACI, as an accredited technical design house, provided engineering advice throughout the assessment. We carried out a detailed utility mapping and asset review, assessing records against the proposed site layout to identify conflicts, easement restrictions, and potential diversion requirements. Where constraints were identified, we provided clear technical recommendations to help the client understand the risks, options, and delivery implications

DACI Solution image
Outcome Image

Outcome

Outcome

- Early identification of high-risk statutory assets

- Professional technical guidance integrated throughout the report

- Informed programme and cost planning

- Reduced risk of unforeseen diversion works and redesign

Confidence to progress the development with certainty DACI's early engagement and technical expertise gave The Client a clear understanding of the site's constraints, significantly reducing project risk before design and delivery.

related case study

Solar & Storage

Long Pasture

DACI Utilities Engineering Consultancy delivered the civil and structural design for the 132 kV substation serving a combined solar and battery storage development at Long Pasture, near Darlington, County Durham.

Read Case Study
Battery Energy Storage

Iron Acton

DACI provided multidisciplinary design for the 120 MW Iron Acton battery energy storage system, including its 132 kV National Grid connection, and developed a non-standard bonding solution that avoided a full cable replacement.

Read Case Study
Residential Development

Warrington Road

The client received a DNO Point of Connection (POC) offer requiring acceptance within a fixed timeframe, followed by a compliant design submission within 30 days.

Read Case Study

Ready to Build Your Next Critical Energy infrastructure project ?

Let's Collaborate deliver resilient, future ready solutions.

Get in Touch
Hands sketching architectural plans with pencil and ruler on a desk with calculator nearby.