DACI Utilities Engineering Consultancy was appointed by the ICP to design the potable water network for the Walton Road development in Drakelow, Burton upon Trent. It comprises 1,961 dwellings and commercial facilities, delivered across four phases by multiple developers.
The network was designed for adoption by the water company under its NAV arrangement, following South Staffs Water's Design and Construction Specification (D&CS) and technical requirements.

The project presented a demanding combination of large-scale phased delivery, supply coordination, and ground and adoption constraints, each requiring precise, coordinated engineering responses.
DACI developed a comprehensive engineering solution combining detailed hydraulic modelling, phased network infrastructure and coordinated supply arrangements, providing a reliable water supply throughout the phased construction programme.
A network-wide EPANET model of all 1,961 properties used 101 l/p/d, four occupants per household and a peak flow factor of 2.25, run at a conservative 35mH source pressure.


The submitted hydraulic calculations demonstrate that the proposed potable water network achieves the design criteria specified by South Stas Water (SSW) under the modelled full-development demand scenario.
The network operates within the velocity and headloss limits while keeping pressure above the minimum requirement. The design conclusion recommends retaining the proposed mains sizing for the approval and construction stages, in line with the Code of Practice for the Self-Laying of Water Mains and Services, England and Wales
The Walton Road project demonstrates DACI's ability to deliver coordinated utility engineering for large-scale residential developments, with multiple developers and complex infrastructure requirements.
A staged supply strategy and resilient network layout give the development a coordinated basis to progress through approval and construction.


DACI Utilities Engineering Consultancy Ltd successfully completed the potable water network design for the Walton Road development, comprising 1,961 dwellings and commercial facilities.The project demonstrates DACI's capability to deliver complex utility engineering through detailed hydraulic modelling, phased infrastructure planning, temporary and permanent supply coordination, and the integration of technical adoption requirements. The hydraulic results show integration of technical adoption requirements. The hydraulic results show the network performing within the specified design limits, giving thedevelopment a coordinated basis to progress through approval andconstruction.

The Minety BESS project comprises two phases: Phase 1, an existing 99.8 MW installation, and Phase 2, a proposed 49.9 MW extension connecting to the 132 kV network.

DACI was appointed to deliver the coordinated multi-utility design for a residential development requiring fully compliant electrical and water infrastructure for adoption under IDNO and NAV frameworks.
.png)
DACI was appointed at an early design stage to review and develop the electrical design for Phase 1 of a 48-dwelling residential scheme.